Jacuzzi Summer Rain 2 Wall and 3 Wall Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Zubehör fürs Wasser Jacuzzi Summer Rain 2 Wall and 3 Wall herunter. Jacuzzi Summer Rain 2 Wall and 3 Wall User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - WALK-IN SHOWER SYSTEMS

SUMMER RAIN™2 WALL & 3 WALLWALK-IN SHOWER SYSTEMSINSTALLATION AND OPERATING INSTRUCTIONS

Seite 2 - IMPORTANT SAFETY INFORMATION

8STEP 1Position the wall posts so the edge of the post is set back3/4" (19 mm) in from the edge of the baseSTEP 2Level both wall posts in their p

Seite 3 - Owner's Record

STEP 5Place the tower onto base. Ensure the curved glasslocates into the glazing channel. Install bolt but do nottighten.STEP 6Insert tower support

Seite 4 - 2 WALL SPECIFICATIONS

STEP 11Secure the rails.10ATTACH RAILBRACKET TO WALLSECURE RAIL TOBRACKET (TURN CWTO TIGHTEN)MOVE COVER CAPOVER BRACKETSTEP 9Place the front rail and

Seite 5 - 2 WALL ROUGH-IN REFERENCE

112 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATIONSTEP 13AInsert fixed glass support rail into panel post and tightenset screw.GLASS PANELSUPP

Seite 6

2 WALL: TOWER, FIXED WALL AND CURVED GLASS INSTALLATIONTOWER COVERINSERT THIS SIDE FIRSTTOWER COVERTOWER TOP PLATE12STEP 16Turn on water supply and c

Seite 7 - DEATAIL 1

13Important: Read complete instructions before beginning installation.Each unit arrives ready for installation, equipped with base, glass and associa

Seite 8

3 WALL ROUGH-IN REFERENCE60"42-5/16"33-3/4"27-15/16"84"23"21-1/2"FRONT VIEWTOP VIEW1/2" RIGIDCOPPER PIPEUNDER

Seite 9 - SILICONE

3 WALL COMPONENT IDENTIFICATIONHEX WRENCH (1)(PROVIDED)MOUNTINGPOSTCAP3 SCREWS AND3 WALL ANCHORSCURVEDGLASSWALLMOUNTINGPOSTTOWER WITH PLUMBING,FIXTURE

Seite 10 - 6 PLACES)

3 WALL BASE INSTALLATIONThe floor structure beneath the unit must be able tosupport a total weight of the unit and bather. Referto the table under to

Seite 11 - SUPPORT RAIL

3 WALL BASE INSTALLATIONSTEP 5With a large screwdriver and the tool included with thedrain, tighten the inside compression nut to seal thedrain pipe c

Seite 12

Note: This is a professional grade product. A knowledge of construction techniques, plumbing and electricalinstallation according to codes are requi

Seite 13 - COVER CAP

STEP 7With a large screwdriver and the tool included with thedrain, tighten the inside compression nut to seal thedrain pipe connection. After drain

Seite 14 - TOWER TOP PLATE

3 WALL: TOWER AND CURVED GLASS INSTALLATIONSTEP 1Position the wall post so the edge of the post is set back3/4" (19 mm) in from the finish wall.

Seite 15 - FRONT VIEW

3 WALL: TOWER AND CURVED GLASS INSTALLATIONSTEP 5Insert support rails into brackets in top moulding of towerbut do not tighten at this time.STEP 6Sli

Seite 16 - 3 WALL ROUGH-IN REFERENCE

3 WALL: TOWER AND CURVED GLASS INSTALLATIONSTEP 9Secure the rails.STEP 10Tighten the tower base bolt. Two shut-off valves areprovided. To hook up s

Seite 17

STEP 13Turn on water supply and check for leaks. Correct anyleaks before installing tower cover.STEP 14Install tower cover as shown. Insert cover at

Seite 18 - EVENLY OVER ENTIRE AREA

2 & 3 WALL OPERATION23STOP RELEASETemperature ValveThe temperature of the mixed water is adjusted by means of thegraduated handle. This handle ha

Seite 19 - INCORRECT

242 & 3 WALL MAINTENANCETo remove any lime scale from the shower head and body sprays , rub with your finger the outer ring of nozzles onthe showe

Seite 20 - CEMENT BOARD

TOWER FIXTURES REPAIR PARTS1. C546000 Lock Nut, 1/2" NPT WP (5X)2. G559000 Ring Compression SS (5X)3. G560000 Washer Rubber (5X)4. U54600

Seite 21 - 3/4"

TOWER PLUMBING REPAIR PARTS1. A944000 (9X) Spring Clamp, .625 OD Hose2. U405000 L=31.0" Tubing, PVC Reinforced, 10mm Barb3. U405000 L=5.5&q

Seite 22

12345 (2X)6 (2X)7 (6X)8910111213 (6X)15171618202114 (6X)1. U134827 Rail Back Walk-in2. U133827 Rail 2 Wall Walk-in3. U245827 Rail Assembly Wa

Seite 23

Owner's RecordSave These Instructions for Future Use.Date Purchased ____________________________________________________________Purchased From __

Seite 24

3 WALL UNIT REPAIR PARTS1. U134827 Rail Back Walk-in 3 Wall2. U245827 Rail Assembly Walk-in 3 Wall3. U149000 Bracket, Mounting Rail4. U119

Seite 25 - 2 & 3 WALL OPERATION

Jacuzzi Whirlpool BathP.O. Box 702168Dallas, TX 75370-2168WARRANTY COVERAGEJacuzzi Whirlpool Bath (the “Company”) offers the following express limited

Seite 26 - Jacuzzi Whirlpool Bath

RESPONSIBILITIES OF OTHERSInspecting the unit prior to installation is the responsibility of the installer or building contractor who acts on behalf o

Seite 27 - TOWER FIXTURES REPAIR PARTS

Important: Read complete instructions before beginning installation.Each unit arrives ready for installation, equipped with base, glass and associate

Seite 28 - TOWER PLUMBING REPAIR PARTS

32 WALL ROUGH-IN REFERENCE60"42-5/16"33-3/4"27-15/16"84"23"21-1/2"FRONT VIEWTOP VIEW1/2" RIGIDCOPPER PIPEUNDER

Seite 29

2 WALL COMPONENT IDENTIFICATION4HEX WRENCH (1)(PROVIDED)STRAIGHTGLASSWALLMOUNTINGPOSTSTRAIGHTGLASSPANELMOUNTINGPOSTCAP (2)3 SCREWS AND3 WALL ANCHORSPE

Seite 30 - 3 WALL UNIT REPAIR PARTS

5PRELIMINARY ROUGH-INSPREAD MORTAR OR LEVELING COMPOUND ETC.EVENLY OVER ENTIRE AREASTRAINERDRAINASSEMBLYSILICONESEALANTSHOWER BASERUBBER WASHERFIBER W

Seite 31

6TIGHTEN SEALING NUTTOOL(INCLUDED)GAPTILEFLANGEINCORRECTSHIMSTUDCORRECTTILEFLANGESTUDUSESCREWS(PROVIDED)USESCREWS(PROVIDED)STEP 5With a large screwdri

Seite 32 - Registration Card

72 WALL BASE INSTALLATIONSTUDCEMENT BOARD1/4" MINIMUM GAPSILICONESEALANTTILETILEADHESIVE1/4" MINIMUMGAPSILICONESEALANTSTUDCEMENTBOARD1/8&quo

Kommentare zu diesen Handbüchern

Keine Kommentare