ELECTRIC FLOOR WARMING SYSTEMSInstallation and Operating Instructions
83.2. Electrical Rough - In: Remodeling ProjectFor a remodeling project, complete the electrical rough-in as follows: • Determine the appropriate loca
9Fig. 1Mat MeshHeating Cable(Clear Poly Covering over Copper Braid)Tail SpliceMat Support Strands(on top of cable)Cold Lead(Black PVC Jacket over Brai
4. Installing Jacuzzi Floor Warming MatsSTEP 1 CONFIGURE MAT TO HEATED AREA1. Consider the location of the ECB, and the routing of the cold lead over
Fig. 4aRectangular room applications require minimal mat reshaping.Area to be heated Fig. 4bFig. 4cCold SpliceTo reshape mat, only cut the mat supp
4. Installing Jacuzzi Floor Warming Mats, cont’d.STEP 2 VERIFICATION1. Check the resistance of each mat and the sensor wire (Fig. 5) before proceedi
5. Installing Control / Power ConnectionInstallation of all control / wiring devices must be according to manufacturer’s in-structions and comply with
Operating Tips• When first energized, the Jacuzzi floor warming system may take up to 3 hours to fully warm your floor.• Energy consumption will vary
TroubleshootingSYMPTOMOverall floor surface feels cold after system has been energized for more than 3 hours.Overall floor surface feels too hot when
LIMITED WARRANTY AND LIABILITYJacuzzi Brands, Inc. warrants to the original purchaser only, that if there are any defects in material or workmanship i
This page intentinally left blank.
WelcomeThank you for choosing the Jacuzzi Floor Warming System. This product has been de-signed to gently warm flooring materials such as marble, cer
©2006 Jacuzzi Brands, Inc. DD33000 Printed in USA
7AKEo5IFUJNFJOUIFNPSOJOHXIFOZPVXBOUUIFnPPSUPTUBSUXBSNJOHVQBCPVUPOFIPVSCFGPSFZPVXBLFVQ,EAVE5IFUJNFXIFOZPVMFBWFGPSXP
"U UIF DPNQMFUJPO PG UIFA8FFL o 4MFFQTFUUJOHTUIF UIFSNPTUBUBVUPNBUJDBMMZTBWFT UIFFOUFSFEWBMVFT BOE CFHJOT PQFSBUJOHUP
Table of ContentsTable of Contents ...1Warnings ...
WARNING!READ BEFORE ATTEMPTING INSTALLATION. FAILURE TO COMPLY WITH THESE WARNINGS OR FOLLOW THE INSTALLATION INSTRUCTIONS PROVIDED WILL
preparation for installationSee page 4 for Heating Cable System Terminology and page 5 for Heating Cable System Key1. Jacuzzi Floor Warming System Ma
4Heating Cable System TerminologyThe following terms may appear frequently throughout these instructions in italicized text. Each is graphically illus
5The Jacuzzi Floor Warming System Installation Instructions introduce terminology to identify and explain key components and how they are installed.
1. Select Thermostat / Switch ControlA thermostat, a voltage adjuster or a switch may control the system. The selected device must have the appropriat
73.1. Electrical Rough - In: New ConstructionFor new construction it is recommended that rough-in be completed before dry-walling begins. • Determine
Kommentare zu diesen Handbüchern